BidCrew Data
BidCrew Data / Mississippi / Prices / 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow
MDOT pay item · 907-626-D004

6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow: Mississippi winning bid prices

The low bidder priced 6" thermoplastic double drop traffic stripe, skip yellow at a median $10.00 per linear foot over the last 12 months (5 contracts), up 400% from the year before and up 117% since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$10.00
5 contracts
Median, prior 12 months
$2.00
9 contracts
Median, 2024
$4.60
8 contracts
Winner vs. field
4% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$2$4$6$8$102020202120222023202420252026*$2.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$5$10$151.0K
Does quantity matter?Median winning price by quantity band
$0$2.5$5$7.5$10$12.5$11.00≤390$6.05390–1.3K$2.251.3K–2.7K$1.45>2.7K

The last 19 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
May 27, 2026Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison459 LF$2.00$2.255
Nov 25, 2025Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette280 LF$11.00$11.506
Nov 25, 2025Bridge Repair on SR 3 over Short Creek, Bridge No. 32.7Yazoo250 LF$6.75$7.005
Oct 28, 2025Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1)Noxubee598 LF$11.00$11.506
Oct 28, 2025Bridge Repair on US 278 over the Buttahatchie River (Bridge No. 21.6Monroe770 LF$10.00$11.504
Aug 26, 2025Bridge Repair on US 72 over KCS Railroad (Bridge No. 64.4)Alcorn3.0K LF$1.10$1.054
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton3.8K LF$1.45$1.683
Jan 28, 2025Bridge Repairs on SR 350 over Chambers Creek, Chambers Creek Relief, & the Norfolk SoutherTishomingo2.5K LF$2.00$2.153
Jan 28, 2025Bridge Repairs on SR 149 over Broad Lake (Bridge No. 206.4) & on US 49W over the Yazoo RivYazoo8.6K LF$1.32$2.854
Jan 28, 2025Bridge Repairs on SRTippah1.6K LF$5.00$5.505
Jan 28, 2025Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee2.0K LF$2.00$2.275
Dec 3, 2024Bridge Repair on SR 2 over the Tuscumbia River and reliefs (Bridge Nos. 45.6, 45.7 & 45.8Alcorn380 LF$9.00$9.004
Nov 26, 2024Bridge Repairs on SR 27 over Copiah Creek (Bridge No. 65.8) & Martinsville Road, Gallatin Copiah160 LF$17.00$16.505
Nov 7, 2024Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington5.3K LF$2.90$2.954
Oct 22, 2024Intersection Improvements on various routes throughout the DistrictDistrict 73.7K LF$1.50–1
Oct 22, 2024Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc1.7K LF$2.50$2.504
Oct 10, 2024Emergency Slide Repair on US 80 in ForestScott1.3K LF$6.05$5.532
Sep 25, 2024Construction project, Lauderdale CountyLauderdale350 LF$11.00$11.003
Aug 27, 2024Construction project, Lowndes CountyLowndes400 LF$3.15$3.003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access