The low bidder priced 29" x 18" concrete arch pipe end section at a median $2,009 per each over the last 12 months (1 contracts), up 10% from the year before and up 22% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2 EA | $2,009 | $2,000 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 2 EA | $1,500 | $1,650 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 4 EA | $1,650 | $1,600 | 3 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 3 EA | $2,740 | $1,900 | 3 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 2 EA | $2,000 | $1,975 | 4 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 2 EA | $1,500 | $1,540 | 4 |
| Oct 22, 2024 | Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo | 2 EA | $2,345 | – | 1 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 8 EA | $1,550 | $1,725 | 2 |
| Jan 24, 2024 | Intersection Improvements at SRSmith | 6 EA | $1,800 | $1,800 | 5 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 2 EA | $1,940 | $1,870 | 2 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 2 EA | $2,800 | – | 1 |
| Aug 22, 2023 | Intersection Improvements on USMadison | 2 EA | $675 | $1,500 | 3 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 3 EA | $1,170 | $1,235 | 2 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 10 EA | $1,500 | $1,397 | 2 |
| Sep 28, 2021 | Construction project, Lauderdale CountyLauderdale | 2 EA | $1,000 | $1,273 | 6 |
| Apr 27, 2021 | Bridge Replacement on SRMarshall | 2 EA | $1,100 | – | 2 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 10 EA | $1,650 | $1,341 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.