The low bidder priced 48" reinforced concrete end section at a median $2,999 per each over the last 12 months (3 contracts), down 14% from the year before and up 22% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 14 EA | $2,999 | $3,099 | 6 |
| Jul 28, 2026 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds | 8 EA | $1.00 | $1.00 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 3 EA | $3,500 | $3,750 | 6 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 5 EA | $3,500 | $3,920 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 1 EA | $3,500 | $4,120 | 3 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 2 EA | $3,360 | $3,290 | 5 |
| Jan 28, 2025 | Overlay approximately 10 miles of SR 43 from SR 481 to the Madison County LineRankin | 2 EA | $5,957 | $5,957 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 10 EA | $3,600 | $3,915 | 2 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 3 EA | $3,300 | – | 1 |
| Dec 5, 2023 | Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison | 1 EA | $2,723 | $3,111 | 2 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 4 EA | $3,500 | $3,750 | 2 |
| Apr 25, 2023 | Construction project, DeSoto CountyDeSoto | 2 EA | $4,875 | $3,500 | 5 |
| Jan 25, 2023 | Construction project, Itawamba CountyItawamba | 1 EA | $3,100 | $3,570 | 3 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 22 EA | $3,700 | $3,497 | 2 |
| Feb 23, 2022 | Construction project, Calhoun CountyCalhoun | 1 EA | $2,690 | $4,000 | 5 |
| Jan 25, 2022 | Construction project, Hinds CountyHinds | 4 EA | $3,900 | $3,200 | 6 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 4 EA | $2,291 | $2,446 | 2 |
| Jul 27, 2021 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones | 3 EA | $2,654 | $2,745 | 2 |
| Jun 22, 2021 | Overlay approximately 7.5 miles on SRStone | 2 EA | $2,996 | $2,996 | 3 |
| Mar 23, 2021 | Bridge Replacement on USJackson | 2 EA | $3,000 | – | 4 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.