BidCrew Data
BidCrew Data / Mississippi / Prices / Video Vehicle Detection Cable
MDOT pay item · 907-643-B001

Video Vehicle Detection Cable: Mississippi winning bid prices

The low bidder priced video vehicle detection cable at a median $1.50 per linear foot over the last 12 months (9 contracts), down 25% from the year before and down 43% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1.50
9 contracts
Median, prior 12 months
$2.00
4 contracts
Median, 2020
$2.62
2 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1$2$3$42020202120222023202420252026*$1.50
Price vs. quantityEvery winning price since 2020 (log scale)
$0$10$20$301001.0K10K
Does quantity matter?Median winning price by quantity band
$0$1$2$3$1.16≤432$2.55432–1.0K$1.531.0K–2.4K$1.60>2.4K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike65 LF$5.05$5.053
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren636 LF$3.25$3.253
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin8.5K LF$0.50$0.636
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren1.2K LF$1.90$1.903
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest5.1K LF$1.80$1.803
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee200 LF$1.00$1.255
Jun 5, 2026Mill & Overlay approximately 3 miles of MS 16/149 from MS 3 to US 49Yazoo100 LF$1.00–1
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake680 LF$0.10$0.104
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee3.2K LF$1.50$1.502
Jul 22, 2025Mill & Overlay approximately 3 miles of US 98 from 400 feet west of Weathersby Drive to thLamar, Forrest1.6K LF$6.85$6.922
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison192 LF$1.00$2.002
Apr 1, 2025Mill & Overlay approximately 4 miles of SR 15 from Queen Street to north of Audubon DriveJones2.4K LF$1.00$1.203
Feb 25, 2025Mill & Overlay approximately 9 miles of US 51 from the Madison City Limits to Dinkins StreMadison1.1K LF$3.00$3.072
Jun 11, 2024Construction project, Lafayette CountyLafayette420 LF$1.25$2.805
May 29, 2024Thin Lift Overlay on approximately 9 miles of SR 63 from Clara to SR 184 & approximately 2Wayne50 LF$1.00$0.512
May 29, 2024Traffic Signal Installation on US 49W at SRSunflower644 LF$3.00$2.002
Jan 24, 2024Construction project, Hinds CountyHinds12K LF$2.50$3.082
Jan 24, 2024Intersection Improvements at SRSmith60 LF$60.00$59.005
Jan 24, 2024Construction project, Harrison CountyHarrison1.2K LF$1.16–1
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison5.4K LF$2.70$2.602

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.