The low bidder priced 42" reinforced concrete end section at a median $4,138 per each over the last 12 months (1 contracts), up 38% from the year before and up 38% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2 EA | $4,138 | $4,138 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 14 EA | $3,000 | $3,200 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 1 EA | $3,000 | $3,000 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 2 EA | $3,450 | $3,125 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 2 EA | $2,550 | $2,520 | 5 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 14 EA | $3,350 | $3,305 | 2 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 3 EA | $5,250 | $4,500 | 2 |
| Dec 5, 2023 | Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River | 2 EA | $2,000 | $2,340 | 5 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 1 EA | $2,900 | – | 1 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 1 EA | $2,700 | $2,850 | 2 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 10 EA | $3,200 | $2,856 | 2 |
| Sep 28, 2022 | Construction project, Jackson CountyJackson | 2 EA | $2,350 | $2,550 | 4 |
| Sep 28, 2022 | Slide Repairs on USHinds | 2 EA | $2,525 | $2,438 | 2 |
| Feb 23, 2022 | Construction project, Calhoun CountyCalhoun | 3 EA | $2,500 | $3,100 | 5 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 4 EA | $3,000 | – | 2 |
| Jul 27, 2021 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones | 7 EA | $2,087 | $2,369 | 2 |
| Apr 27, 2021 | Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne | 4 EA | $1,550 | – | 4 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 2 EA | $3,500 | $2,086 | 3 |
| Jul 28, 2020 | Overlay approximatelyPearl River | 2 EA | $3,000 | $3,817 | 3 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 6 EA | $2,136 | $2,898 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.