The low bidder priced 42" reinforced concrete end section at a median $4,138 per each over the last 12 months (1 contracts), up 38% from the year before and up 38% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$4,138
1 contracts
Median, prior 12 months
$3,000
4 contracts
Median, 2020
$3,000
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1,000$2,000$3,000$4,000$5,0002020202120222023202420252026*$4,138
Price vs. quantityEvery winning price since 2020 (log scale)
$1,000$2,000$3,000$4,000$5,000110
Does quantity matter?Median winning price by quantity band
$0$1,000$2,000$3,000$2,900≤2$0.0002–2$2,7502–4.5$3,000>4.5

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison2 EA$4,138$4,1383
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette14 EA$3,000$3,2003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison1 EA$3,000$3,0003
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba2 EA$3,450$3,1252
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson2 EA$2,550$2,5205
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah14 EA$3,350$3,3052
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike3 EA$5,250$4,5002
Dec 5, 2023Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River2 EA$2,000$2,3405
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison1 EA$2,900–1
Aug 1, 2023Construction project, Pontotoc CountyPontotoc1 EA$2,700$2,8502
Oct 25, 2022Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson10 EA$3,200$2,8562
Sep 28, 2022Construction project, Jackson CountyJackson2 EA$2,350$2,5504
Sep 28, 2022Slide Repairs on USHinds2 EA$2,525$2,4382
Feb 23, 2022Construction project, Calhoun CountyCalhoun3 EA$2,500$3,1005
Aug 24, 2021Construction project, Jackson CountyJackson4 EA$3,000–2
Jul 27, 2021Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones7 EA$2,087$2,3692
Apr 27, 2021Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne4 EA$1,550–4
Oct 27, 2020Construction project, Neshoba CountyNeshoba2 EA$3,500$2,0863
Jul 28, 2020Overlay approximatelyPearl River2 EA$3,000$3,8173
Feb 25, 2020Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba6 EA$2,136$2,8983

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access