The low bidder priced reinforcement at a median $2.00 per pound over the last 12 months (14 contracts), up 21% from the year before and up 82% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala | 706 LBS | $5.00 | $5.00 | 4 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 1.1M LBS | $2.10 | $2.10 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 745 LBS | $2.50 | $5.13 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 402K LBS | $1.91 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 64K LBS | $2.00 | $2.85 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 36K LBS | $2.20 | $2.40 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 816K LBS | $1.57 | $1.68 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 10K LBS | $3.00 | $2.88 | 4 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 831 LBS | $6.50 | $5.00 | 3 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 36K LBS | $1.72 | $1.73 | 8 |
| Jul 28, 2026 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo | 105K LBS | $1.60 | $1.60 | 5 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 80K LBS | $1.50 | $1.64 | 8 |
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 133K LBS | $2.00 | $1.80 | 5 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 54K LBS | $1.51 | $1.60 | 7 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 39K LBS | $1.65 | $1.57 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 1.8M LBS | $1.50 | $1.57 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 1.6M LBS | $1.60 | $1.90 | 3 |
| Apr 22, 2025 | Bridge Repair on US 80 over Pearl River Relief (Bridge No. 46.9)Rankin | 1.1K LBS | $12.00 | – | 1 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 5.8K LBS | $2.50 | $2.55 | 2 |
| Mar 25, 2025 | Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin | 2.9K LBS | $2.35 | $3.65 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.