The low bidder priced 6" thermoplastic double drop traffic stripe, continuous yellow at a median $2.38 per linear foot over the last 12 months (6 contracts), down 42% from the year before and down 53% since 2024.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 2.1K LF | $2.00 | $2.25 | 5 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 1.6K LF | $2.95 | $2.95 | 5 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 533 LF | $2.50 | $2.27 | 4 |
| Oct 29, 2025 | Bridge Repair on I-220 over Lynch Street (Bridge Nos. 0.5A & 0.5B) & on I-55 North to I-22Hinds, Madison | 1.9K LF | $6.60 | $6.60 | 3 |
| Oct 28, 2025 | Bridge Repair on US 98 Magees Creek and Relief Bridges Nos. 99.0, 99.0B, 99.1 & 99.1BWalthall | 1.1K LF | $1.90 | $1.87 | 2 |
| Oct 28, 2025 | Bridge Repair on US 61 over St. Catherine Creek (Bridge Nos. 49.5A & 49.5B)Adams | 900 LF | $2.25 | $2.25 | 3 |
| Sep 23, 2025 | Bridge Repair on Peyton Road over I-55 (Bridge No.270.2)Tate | 700 LF | $10.00 | $11.00 | 6 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 3.8K LF | $2.00 | $2.19 | 4 |
| Sep 4, 2025 | Bridge Repairs on Old US 11 over I-59 (Bridge No. 47.9) & Richburg Road over I-59 (Bridge Lamar | 1.6K LF | $5.50 | $5.50 | 5 |
| Aug 26, 2025 | Bridge Preventive Maintenance on SR 528 over I-59 (Bridge No. 20.3)Jasper | 508 LF | $11.00 | $11.50 | 5 |
| Aug 26, 2025 | Bridge Repair on US 72 over KCS Railroad (Bridge No. 64.4)Alcorn | 3.0K LF | $2.75 | $2.63 | 4 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 4.3K LF | $2.00 | $1.80 | 3 |
| Jul 22, 2025 | Bridge Repair on Russell-Mount Gilead Road over I-59 / I-20 (Bridge No. 160.3)Lauderdale | 600 LF | $5.50 | $6.00 | 3 |
| Jul 22, 2025 | Bridge Repair on Franklin Road over I-55 (Bridge No. 147.4) & on Old Wilson Road over I-55Holmes | 1.3K LF | $5.40 | $5.50 | 5 |
| Jul 22, 2025 | Bridge Repair on Madison Street over MS 178 (Bridge No. 88.0)Lee | 500 LF | $10.00 | $11.00 | 6 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 9.2K LF | $1.85 | $2.13 | 3 |
| Jun 25, 2025 | Bridge Repair on SR 43 over the Pearl River Relief (Bridge No. 183.8)Madison | 60 LF | $100 | $80.50 | 2 |
| Jun 24, 2025 | Mill & Overlay on I-55 ramps at the SR 463 interchangeMadison | 4.8K LF | $1.85 | $1.85 | 3 |
| Jun 24, 2025 | Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson | 3.1K LF | $1.80 | $1.70 | 2 |
| May 28, 2025 | Bridge Repair on City Point Road over US 45 (Bridge No. 219.6)Lee | 710 LF | $12.00 | $11.00 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.