BidCrew Data
BidCrew Data / Mississippi / Prices / 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow
MDOT pay item · 907-626-E004

6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow: Mississippi winning bid prices

The low bidder priced 6" thermoplastic double drop traffic stripe, continuous yellow at a median $2.38 per linear foot over the last 12 months (6 contracts), down 42% from the year before and down 53% since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$2.38
6 contracts
Median, prior 12 months
$4.13
30 contracts
Median, 2024
$5.00
17 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2$4$6$8$102020202120222023202420252026*$2.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$10$20$301001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$8$7.95≤703$4.50703–1.3K$2.951.3K–4.1K$2.55>4.1K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
May 27, 2026Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison2.1K LF$2.00$2.255
Nov 25, 2025Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren1.6K LF$2.95$2.955
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington533 LF$2.50$2.274
Oct 29, 2025Bridge Repair on I-220 over Lynch Street (Bridge Nos. 0.5A & 0.5B) & on I-55 North to I-22Hinds, Madison1.9K LF$6.60$6.603
Oct 28, 2025Bridge Repair on US 98 Magees Creek and Relief Bridges Nos. 99.0, 99.0B, 99.1 & 99.1BWalthall1.1K LF$1.90$1.872
Oct 28, 2025Bridge Repair on US 61 over St. Catherine Creek (Bridge Nos. 49.5A & 49.5B)Adams900 LF$2.25$2.253
Sep 23, 2025Bridge Repair on Peyton Road over I-55 (Bridge No.270.2)Tate700 LF$10.00$11.006
Sep 23, 2025Bridge Replacement on SR 704 (Bridge No. 162.5)Benton3.8K LF$2.00$2.194
Sep 4, 2025Bridge Repairs on Old US 11 over I-59 (Bridge No. 47.9) & Richburg Road over I-59 (Bridge Lamar1.6K LF$5.50$5.505
Aug 26, 2025Bridge Preventive Maintenance on SR 528 over I-59 (Bridge No. 20.3)Jasper508 LF$11.00$11.505
Aug 26, 2025Bridge Repair on US 72 over KCS Railroad (Bridge No. 64.4)Alcorn3.0K LF$2.75$2.634
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison4.3K LF$2.00$1.803
Jul 22, 2025Bridge Repair on Russell-Mount Gilead Road over I-59 / I-20 (Bridge No. 160.3)Lauderdale600 LF$5.50$6.003
Jul 22, 2025Bridge Repair on Franklin Road over I-55 (Bridge No. 147.4) & on Old Wilson Road over I-55Holmes1.3K LF$5.40$5.505
Jul 22, 2025Bridge Repair on Madison Street over MS 178 (Bridge No. 88.0)Lee500 LF$10.00$11.006
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton9.2K LF$1.85$2.133
Jun 25, 2025Bridge Repair on SR 43 over the Pearl River Relief (Bridge No. 183.8)Madison60 LF$100$80.502
Jun 24, 2025Mill & Overlay on I-55 ramps at the SR 463 interchangeMadison4.8K LF$1.85$1.853
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson3.1K LF$1.80$1.702
May 28, 2025Bridge Repair on City Point Road over US 45 (Bridge No. 219.6)Lee710 LF$12.00$11.002

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access