MDOT let 2 contracts worth $2.2M at the low bid, with 3.00 bidders per contract (the 12-month average is 3.70). Ste-Bil Grading Inc. won the most, $1.1M; 2 firms won at least one contract. The closest finish: Bridge Repair on SR 13 (Bridge No. 104.3), decided by 1.0% ($11K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2 | Bridge Repair on SR 43 over the Pearl River Relief (Bridge No. 183.8)Madison · Bridge repair & rehab · 109681301 | Ste-Bil Grading Inc.2nd: Joe McGee Construction Company, Inc. | $1.1M | $1.4M | 19.9% | 2 | +9.4% |
| 1 | Bridge Repair on SR 13 (Bridge No. 104.3)Simpson · Bridge repair & rehab · 109811301 | Hope Enterprises, LLC2nd: Hemphill Construction Company, Inc. | $1.1M | $1.1M | 1.0% | 4 | −1.5% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.