The low bidder priced rockbags at a median $11.80 per each over the last 12 months (11 contracts), down 32% from the year before and up 7% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 2.3K EA | $7.25 | $10.84 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 550 EA | $11.80 | – | 1 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 100 EA | $21.95 | $21.95 | 3 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 15 EA | $10.00 | $21.00 | 4 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 1.1K EA | $9.50 | $9.50 | 3 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 30 EA | $8.00 | $13.82 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 600 EA | $15.00 | $15.00 | 6 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 100 EA | $15.00 | $15.00 | 5 |
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 50 EA | $5.60 | $28.52 | 4 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 8 EA | $17.65 | $22.00 | 7 |
| Nov 25, 2025 | Ditch Repair on I-20 near the Springridge Road InterchangeHinds | 30 EA | $29.20 | $20.00 | 5 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 41 EA | $17.40 | $17.40 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 22K EA | $8.00 | $8.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 650 EA | $4.50 | $15.00 | 3 |
| Jun 24, 2025 | Mill & Overlay on I-55 ramps at the SR 463 interchangeMadison | 200 EA | $15.00 | $15.00 | 3 |
| Mar 25, 2025 | Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin | 40 EA | $20.25 | $27.00 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 5.0K EA | $20.00 | $16.35 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 1.1K EA | $17.50 | $13.00 | 5 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 100 EA | $5.00 | $23.50 | 5 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 96 EA | $26.29 | – | 1 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.