BidCrew Data
BidCrew Data / Mississippi / Prices / Rockbags
MDOT pay item · 246-B001

Rockbags: Mississippi winning bid prices

The low bidder priced rockbags at a median $11.80 per each over the last 12 months (11 contracts), down 32% from the year before and up 7% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$11.80
11 contracts
Median, prior 12 months
$17.45
10 contracts
Median, 2020
$11.00
6 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$5$10$15$20$252020202120222023202420252026*$10.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$10$20$30101001.0K10K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$13.50≤100$11.00100–200$12.50200–686$8.95>686

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren2.3K EA$7.25$10.843
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson550 EA$11.80–1
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike100 EA$21.95$21.953
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba15 EA$10.00$21.004
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest1.1K EA$9.50$9.503
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison30 EA$8.00$13.823
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto600 EA$15.00$15.006
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette100 EA$15.00$15.005
Apr 28, 2026I-10 Jackson County Welcome CenterJackson50 EA$5.60$28.524
Nov 25, 2025Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith8 EA$17.65$22.007
Nov 25, 2025Ditch Repair on I-20 near the Springridge Road InterchangeHinds30 EA$29.20$20.005
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln41 EA$17.40$17.403
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison22K EA$8.00$8.003
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton650 EA$4.50$15.003
Jun 24, 2025Mill & Overlay on I-55 ramps at the SR 463 interchangeMadison200 EA$15.00$15.003
Mar 25, 2025Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin40 EA$20.25$27.003
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba5.0K EA$20.00$16.352
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson1.1K EA$17.50$13.005
Jan 28, 2025Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee100 EA$5.00$23.505
Jan 28, 2025Drainage Improvements on US 61 near BlakelyWarren96 EA$26.29–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access