BidCrew Data
BidCrew Data / Mississippi / Prices / Square Tube Posts, 4.0 lb/ft
MDOT pay item · 630-C001

Square Tube Posts, 4.0 lb/ft: Mississippi winning bid prices

The low bidder priced square tube posts, 4.0 lb/ft at a median $47.25 per linear foot over the last 12 months (25 contracts), up 5% from the year before and up 15% since 2021.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$47.25
25 contracts
Median, prior 12 months
$45.00
25 contracts
Median, 2021
$41.00
17 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$30$40$50$60$702020202120222023202420252026*$47.67
Price vs. quantityEvery winning price since 2020 (log scale)
$20$40$60$80$1001001.0K10K
Does quantity matter?Median winning price by quantity band
$0$20$40$60$51.50≤60$55.1860–156$48.00156–428$47.10>428

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison559 LF$56.90$56.903
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin868 LF$51.00$50.506
Sep 22, 2026Installation of Audible Thermoplastic Traffic Markings & Thermoplastic Pavement Markings oDeSoto, Panola, Tate15 LF$75.00$1132
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate180 LF$47.25$48.383
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha610 LF$47.12–4
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie90 LF$52.36$53.756
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest2.3K LF$56.50$56.503
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison169 LF$51.52$50.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee93 LF$47.00$50.005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto170 LF$50.00$52.806
Jun 5, 2026Mill & Overlay approximately 9 miles of SR 25 from US 45A to US 45Monroe12 LF$58.00$59.022
May 27, 2026Widening of US 51 from Glenwild to North StreetGrenada60 LF$37.00$38.002
May 27, 2026Scrub Seal & Overlay approximately 12 miles of MS 172 from the junction of US 72 to the JuTishomingo185 LF$40.00$40.002
May 27, 2026Mill & Overlay 10 miles of SR 371 from the Mantachie Corp. limit to the Prentiss County LiItawamba24 LF$40.00$40.003
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin966 LF$45.00$51.502
May 27, 2026Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo30 LF$47.67$47.844
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee356 LF$38.98$38.492
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette345 LF$35.00$36.655
Apr 28, 2026I-10 Jackson County Welcome CenterJackson299 LF$48.85$48.584
Apr 10, 2026Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo323 LF$56.41$48.663

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access