Delineators, Post Mounted, Single White: Mississippi winning bid prices

The low bidder priced delineators, post mounted, single white at a median $99.53 per each over the last 12 months (9 contracts), up 64% from the year before and up 121% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$99.53
9 contracts
Median, prior 12 months
$60.75
8 contracts
Median, 2020
$45.00
5 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$20$40$60$80$100$1202020202120222023202420252026*$99.77
Price vs. quantityEvery winning price since 2020 (log scale)
$0$25$50$75$100$125$15010100
Does quantity matter?Median winning price by quantity band
$0$20$40$60$80$67.00≤26$58.0026–53$45.6053–85$60.00>85

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery78 EA$57.25–1
Oct 27, 2026Construction project, Madison CountyMadison61 EA$121$1213
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin20 EA$130$1276
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison5 EA$99.53$95.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee7 EA$100$1005
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison14 EA$112$1162
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette27 EA$26.00$30.005
Apr 28, 2026OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin80 EA$45.60$45.603
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe55 EA$45.00$45.004
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette65 EA$119$1193
Aug 26, 2025Mill & Overlay approximately 4.3 miles of I-55 Carroll Co from the Montgomery County Line Carroll, Montgomery28 EA$55.50–1
Jul 31, 2025Mill & Overlay approximately 14 miles of I-22 in Union County from the junction at SR 30 tUnion, Pontotoc186 EA$50.00$50.002
May 28, 2025Remove & Replace OGFC Lift on approximately 2 miles of I-220 from the Hinds County Line toMadison, Hinds475 EA$120$1202
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton28 EA$46.58–1
Feb 25, 2025Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott CouRankin32 EA$85.00$85.003
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren24 EA$66.00$65.903
Nov 26, 2024Mill & Overlay approximately 5 miles of I-22 from the Union County Line to the Belden ExitLee, Pontotoc80 EA$45.00$45.003
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah4 EA$77.00$80.352
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike102 EA$82.50$78.752
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison192 EA$95.00–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access