BidCrew Data / Mississippi / Prices / Saw Cut, 3-inch
MDOT pay item · 503-C004

Saw Cut, 3-inch: Mississippi winning bid prices

The low bidder priced saw cut, 3-inch at a median $1.85 per linear foot over the last 12 months (4 contracts), down 65% from the year before and down 93% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1.85
4 contracts
Median, prior 12 months
$5.25
3 contracts
Median, 2020
$25.00
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$10$20$302020202120222023202420252026*$1.85
Price vs. quantityEvery winning price since 2020 (log scale)
$0$10$20$301001.0K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$25.00≤202$13.75202–464$5.25464–820$4.75>820

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren2.7K LF$1.70$2.003
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin197 LF$1.50$11.506
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee1.0K LF$15.00$15.382
Apr 28, 2026OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin629 LF$2.00$2.003
Apr 30, 2025Mill & Overlay & Concrete Rehabilitation on approximately 2 miles of SR 25 from the BOSM tHinds300 LF$5.00$5.003
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton740 LF$15.00–1
Feb 25, 2025Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott CouRankin574 LF$5.25$5.253
Jul 30, 2024Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo1.2K LF$10.00$10.003
Jun 25, 2024Intersection Improvements on USRankin96 LF$20.00$18.502
May 29, 2024Overlay approximatelyRankin240 LF$9.50$9.504
Oct 24, 2023Overlay approximatelyRankin514 LF$2.50$0.0103
Aug 22, 2023Overlay approximatelySimpson260 LF$5.00$5.004
Nov 22, 2022Mill & Overlay approximately 2 miles of SR 15 from 0.60 miles south of the SR 21 / SRNeshoba38 LF$25.00–1
Sep 28, 2022Construction project, Jefferson CountyJefferson48 LF$25.00$25.003
Aug 23, 2022Overlay project, Hinds & Rankin CountyHinds, Rankin168 LF$30.00–1
Jul 27, 2022Construction project, Hinds CountyHinds900 LF$2.00$2.003
May 24, 2022Overlay approximatelySunflower900 LF$3.50–1
Apr 26, 2022Overlay approximately 4.8 miles on SRPontotoc2.9K LF$6.00$6.913
Apr 26, 2022Construction project, Hinds CountyHinds206 LF$22.25$21.132
Mar 22, 2022Overlay approximatelyCarroll464 LF$18.00–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.