BidCrew Data
BidCrew Data / Mississippi / Prices / Joint Repair
MDOT pay item · 907-808-A002

Joint Repair: Mississippi winning bid prices

The low bidder priced joint repair at a median $1.25 per linear foot over the last 12 months (25 contracts), up 14% from the year before and down 75% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1.25
25 contracts
Median, prior 12 months
$1.10
17 contracts
Median, 2020
$5.06
15 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$10$20$302020202120222023202420252026*$1.08
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60$801001.0K10K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$5.00≤299$5.00299–772$1.80772–1.5K$2.00>1.5K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren1.4K LF$39.65$39.653
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin302 LF$5.50$5.616
Sep 22, 2026Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington364 LF$1.10$2.054
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn244 LF$23.50$25.007
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey430 LF$1.00$1.003
Aug 25, 2026US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma230 LF$1.00$1.056
Aug 21, 2026Emergency Bridge Repair on I-55 over SR 32 (Bridge No. 226.7B)Yalobusha112 LF$6.25$6.005
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds1.2K LF$1.00$1.003
Jul 28, 2026Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo171 LF$20.00$20.005
Jul 28, 2026Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar1.1K LF$1.00$1.104
May 27, 2026Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola672 LF$35.00$35.005
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake986 LF$1.00$1.004
May 27, 2026Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo1.5K LF$1.00$1.004
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee1.2K LF$1.00$1.002
Apr 28, 2026Ultra-Thin Overlay & Safety Improvements on approximately 8 miles of existing SR 482 from Neshoba720 LF$1.25$1.064
Apr 10, 2026Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo1.7K LF$1.05$1.053
Feb 24, 2026Mill & Overlay approximately 9.8 miles of SR 25 from Renfroe to the Attala County LineLeake3.5K LF$1.00$1.005
Feb 24, 2026Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower1.5K LF$2.00$1.107
Nov 25, 2025Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren250 LF$1.15$27.505
Nov 25, 2025Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette331 LF$25.00$25.006

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access