The low bidder priced joint repair at a median $1.25 per linear foot over the last 12 months (25 contracts), up 14% from the year before and down 75% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 1.4K LF | $39.65 | $39.65 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 302 LF | $5.50 | $5.61 | 6 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 364 LF | $1.10 | $2.05 | 4 |
| Sep 22, 2026 | Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn | 244 LF | $23.50 | $25.00 | 7 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 430 LF | $1.00 | $1.00 | 3 |
| Aug 25, 2026 | US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma | 230 LF | $1.00 | $1.05 | 6 |
| Aug 21, 2026 | Emergency Bridge Repair on I-55 over SR 32 (Bridge No. 226.7B)Yalobusha | 112 LF | $6.25 | $6.00 | 5 |
| Jul 28, 2026 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds | 1.2K LF | $1.00 | $1.00 | 3 |
| Jul 28, 2026 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo | 171 LF | $20.00 | $20.00 | 5 |
| Jul 28, 2026 | Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar | 1.1K LF | $1.00 | $1.10 | 4 |
| May 27, 2026 | Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola | 672 LF | $35.00 | $35.00 | 5 |
| May 27, 2026 | Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake | 986 LF | $1.00 | $1.00 | 4 |
| May 27, 2026 | Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo | 1.5K LF | $1.00 | $1.00 | 4 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 1.2K LF | $1.00 | $1.00 | 2 |
| Apr 28, 2026 | Ultra-Thin Overlay & Safety Improvements on approximately 8 miles of existing SR 482 from Neshoba | 720 LF | $1.25 | $1.06 | 4 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 1.7K LF | $1.05 | $1.05 | 3 |
| Feb 24, 2026 | Mill & Overlay approximately 9.8 miles of SR 25 from Renfroe to the Attala County LineLeake | 3.5K LF | $1.00 | $1.00 | 5 |
| Feb 24, 2026 | Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower | 1.5K LF | $2.00 | $1.10 | 7 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 250 LF | $1.15 | $27.50 | 5 |
| Nov 25, 2025 | Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette | 331 LF | $25.00 | $25.00 | 6 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.