The low bidder priced topsoil for slope treatment, contractor furnished at a median $1.00 per cubic yard over the last 12 months (23 contracts), flat from the year before and down 95% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery | 467 CY | $38.50 | – | 1 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 30K CY | $0.010 | $5.00 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 5.3K CY | $24.75 | $9.00 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 7.4K CY | $1.00 | $1.00 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 3.3K CY | $29.50 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 13K CY | $12.00 | $9.00 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 847 CY | $0.010 | $30.00 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 6.4K CY | $1.00 | $0.90 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 106 CY | $0.010 | $0.51 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 1.1K CY | $0.010 | $1.00 | 8 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 552 CY | $36.00 | $36.00 | 3 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 633 CY | $25.00 | $25.00 | 3 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 1.4K CY | $0.010 | $1.00 | 8 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 1.9K CY | $1.00 | $0.51 | 2 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 1.3K CY | $1.00 | $1.02 | 2 |
| May 8, 2026 | Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper | 350 CY | $35.00 | $65.00 | 3 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 3.3K CY | $1.00 | $1.00 | 5 |
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 1.7K CY | $0.010 | $34.98 | 4 |
| Feb 3, 2026 | Slide Repair on US 61 Southbound across from Fire Tower RoadAdams | 583 CY | $1.00 | $9.50 | 4 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 2.9K CY | $13.60 | $13.60 | 7 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.