Topsoil for Slope Treatment, Contractor Furnished: Mississippi winning bid prices

The low bidder priced topsoil for slope treatment, contractor furnished at a median $1.00 per cubic yard over the last 12 months (23 contracts), flat from the year before and down 95% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1.00
23 contracts
Median, prior 12 months
$1.00
18 contracts
Median, 2020
$20.50
17 contracts
Winner vs. field
20% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$10$20$302020202120222023202420252026*$1.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$601001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$32.00≤475$12.50475–1.5K$1.571.5K–3.9K$1.00>3.9K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery467 CY$38.50–1
Oct 27, 2026Construction project, Madison CountyMadison30K CY$0.010$5.003
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren5.3K CY$24.75$9.003
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin7.4K CY$1.00$1.004
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson3.3K CY$29.50–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin13K CY$12.00$9.006
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike847 CY$0.010$30.003
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie6.4K CY$1.00$0.906
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba106 CY$0.010$0.514
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee1.1K CY$0.010$1.008
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest552 CY$36.00$36.003
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison633 CY$25.00$25.003
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake1.4K CY$0.010$1.008
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin1.9K CY$1.00$0.512
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee1.3K CY$1.00$1.022
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper350 CY$35.00$65.003
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette3.3K CY$1.00$1.005
Apr 28, 2026I-10 Jackson County Welcome CenterJackson1.7K CY$0.010$34.984
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams583 CY$1.00$9.504
Nov 25, 2025Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith2.9K CY$13.60$13.607

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access