BidCrew Data
BidCrew Data / Mississippi / Prices / Additional Construction Signs
MDOT pay item · 618-B001

Additional Construction Signs: Mississippi winning bid prices

The low bidder priced additional construction signs at a median $10.00 per square foot over the last 12 months (80 contracts), flat from the year before and flat since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$10.00
80 contracts
Median, prior 12 months
$10.00
65 contracts
Median, 2020
$10.00
73 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$102020202120222023202420252026*$10.00
Price vs. quantityEvery winning price since 2020 (log scale)
$10110
Does quantity matter?Median winning price by quantity band
$0$2.5$5$7.5$10$10.00≤1$0.0001–1$10.001–2$10.00>2

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Installation of Audible Stripe on MS 350 from MS 2 to CR 100Alcorn1 SF$10.00$10.002
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 frPontotoc1 SF$10.00–1
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 363 frItawamba, Lee2 SF$10.00$10.002
Oct 27, 2026Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala1 SF$10.00$10.004
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike1 SF$10.00$10.003
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke2 SF$10.00$10.002
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest2 SF$10.00–1
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River1 SF$10.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery5 SF$10.00–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall1 SF$10.00$10.004
Sep 22, 2026Installation of Audible Thermoplastic Traffic Markings & Thermoplastic Pavement Markings oDeSoto, Panola, Tate3 SF$10.00$10.002
Sep 22, 2026Safety Improvements & Pavement Markings approximately 30.3 miles of MS 309 from Byhalia toMarshall1 SF$10.00$10.002
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington1 SF$10.00$10.006
Sep 22, 2026Mill & Overlay approximately 2.5 miles of US 49 from SR 1 to the Isle of Capri ParkwayCoahoma1 SF$10.00–1
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate3 SF$10.00$10.003
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha1 SF$10.00–4
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn1 SF$10.00$10.007
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson1 SF$10.00$10.004
Aug 25, 2026Overlay approximately 2.9 miles of MS 354 from the junction of MS 15 to the end of state mTippah1 SF$10.00$10.003
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington1 SF$10.00–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor