Undersealing: Mississippi winning bid prices

The low bidder priced undersealing at a median $5.00 per pound over the last 12 months (22 contracts), down 24% from the year before and up 42% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$5.00
22 contracts
Median, prior 12 months
$6.55
26 contracts
Median, 2020
$3.53
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$3$4$5$6$72020202120222023202420252026*$5.00
Price vs. quantityEvery winning price since 2020 (log scale)
$2$4$6$8$101.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$8$6.00≤2.5K$6.002.5K–3.2K$6.403.2K–7.7K$4.70>7.7K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn2.5K LBS$5.90$5.907
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington10K LBS$5.00–1
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey1.0K LBS$6.00$5.253
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren24K LBS$4.00$4.753
Aug 25, 2026US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma280 LBS$20.00$11.506
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo4.0K LBS$5.00$6.138
Jun 23, 2026Bridge Repair on SR 22 over Persimmon Creek (Bridge No. 32.5)Madison2.5K LBS$4.75$5.307
Jun 5, 2026Bridge Repair on MS 311 over Little Coldwater River (Bridge No. 11.8)Marshall2.0K LBS$6.00$6.009
May 27, 2026Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola4.0K LBS$5.00$7.005
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake1.0K LBS$6.00$6.004
May 27, 2026Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo500 LBS$6.00$6.004
May 8, 2026Scrub Seal and Overlay approximately 8 miles of SR 12 from Black Creek in Lexington to EllHolmes4.0K LBS$4.50$5.682
Apr 10, 2026Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo10K LBS$5.00$5.003
Feb 24, 2026Overlay approximately 5.3 miles of SR 27 from 0.2 mile south of Old Highway 27 to 0.35 milCopiah2.0K LBS$8.00$6.855
Feb 24, 2026Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower3.0K LBS$5.00$7.007
Nov 25, 2025Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren2.5K LBS$8.25$7.435
Nov 25, 2025Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette3.1K LBS$5.00$8.356
Nov 25, 2025Bridge Repair on SR 3 over Short Creek, Bridge No. 32.7Yazoo4.0K LBS$5.00$5.255
Oct 28, 2025Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 oDeSoto, Marshall6.0K LBS$7.43$7.435
Oct 28, 2025Bridge Repair on US 278 over the Buttahatchie River (Bridge No. 21.6Monroe2.0K LBS$4.50$8.094

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.