BidCrew Data
BidCrew Data / Mississippi / Prices / 30" Reinforced Concrete End Section
MDOT pay item · 603-CB005

30" Reinforced Concrete End Section: Mississippi winning bid prices

The low bidder priced 30" reinforced concrete end section at a median $1,733 per each over the last 12 months (6 contracts), down 1% from the year before and up 57% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,733
6 contracts
Median, prior 12 months
$1,750
13 contracts
Median, 2020
$1,103
4 contracts
Winner vs. field
0% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$1,000$2,000$3,000$4,0002020202120222023202420252026*$1,733
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000$5,000110
Does quantity matter?Median winning price by quantity band
$0$1,000$2,000$3,000$1,730≤1.25$1,7251.25–2$2,3132–4.75$1,603>4.75

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison1 EA$1,221$2,2003
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin5 EA$1,506$1,5536
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha1 EA$3,000–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike2 EA$2,899$2,8993
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie1 EA$1,200$1,6076
Aug 21, 2026Emergency Slope Repair & Pipe Cleanout on SR 26George, Perry1 EA$1,960$1,8603
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette13 EA$1,500$1,8503
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln2 EA$2,832$2,6853
Aug 26, 2025Copi Construction of Equipment Shed & Material Shed, and Lot Improvements in the Copiah CoCopiah1 EA$1,150$1,3664
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison2 EA$1,700$1,7203
Jul 22, 2025Mill & Overlay approximately 10 miles of SR 389 from US 82 to the Clay County LineOktibbeha2 EA$3,000$3,0002
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson2 EA$2,000$1,7002
Apr 1, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba2 EA$1,750$1,5752
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton1 EA$4,500–1
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba31 EA$1,850$1,8002
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson2 EA$1,390$1,4005
Feb 4, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba2 EA$1,175–1
Jan 28, 2025Drainage Improvements on US 61 near BlakelyWarren2 EA$1,249–1
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren1 EA$2,830$1,8753
Oct 22, 2024Safety Improvements on SR 25 at Longview RoadOktibbeha3 EA$3,000$2,2502

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access