The low bidder priced removal of bridge at a median $68,000 per each over the last 12 months (9 contracts), down 55% from the year before and up 2% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 2 EA | $666,700 | – | 1 |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe | 2 EA | $247,500 | $247,500 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 4 EA | $41,930 | $41,930 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 3 EA | $384,000 | $450,000 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 1 EA | $30,000 | $60,150 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 1 EA | $10,000 | $52,250 | 8 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 1 EA | $100,000 | $94,250 | 8 |
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 1 EA | $5,989 | $16,300 | 5 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 1 EA | $68,000 | $68,000 | 7 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 1 EA | $105,000 | $84,000 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 3 EA | $125,100 | $125,100 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 13 EA | $150,000 | $400,000 | 3 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 2 EA | $230,000 | $165,000 | 2 |
| Mar 25, 2025 | Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin | 1 EA | $201,000 | $89,500 | 3 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 2 EA | $100,000 | – | 1 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 1 EA | $1,500,000 | $1,250,000 | 4 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 2 EA | $35,000 | $45,500 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 1 EA | $100,000 | $129,750 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 1 EA | $100,000 | $110,000 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 4 EA | $38,500 | $100,000 | 7 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.