The low bidder priced bridge concrete, class bd at a median $2,000 per cubic yard over the last 12 months (3 contracts), up 18% from the year before and up 95% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala | 3 CY | $2,000 | $9,850 | 4 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 71 CY | $2,719 | $3,867 | 6 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 1.0K CY | $1,600 | $1,600 | 6 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 1.2K CY | $1,700 | $2,025 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 197 CY | $1,500 | $2,455 | 4 |
| Jun 4, 2024 | Bridge Replacements on USHolmes | 1.5K CY | $1,280 | $1,400 | 7 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 3.3K CY | $1,500 | $1,375 | 2 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 1.5K CY | $3,600 | – | 1 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 2.4K CY | $1,620 | $1,660 | 2 |
| Sep 27, 2023 | Construction project, Jackson CountyJackson | 1.9K CY | $1,510 | $1,510 | 3 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 8.2K CY | $1,810 | $1,945 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 4.2K CY | $1,280 | $1,390 | 2 |
| Sep 28, 2021 | Construction project, Lee CountyLee | 533 CY | $1,180 | $1,220 | 6 |
| Apr 27, 2021 | Bridge Replacement on SRMarshall | 336 CY | $1,100 | – | 2 |
| Sep 22, 2020 | Construction project, Jackson CountyJackson | 672 CY | $1,100 | $1,200 | 3 |
| Apr 28, 2020 | Bridge Replacements on SRLeake | 1.2K CY | $1,200 | – | 1 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 1.7K CY | $950 | – | 3 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 4.0K CY | $800 | $979 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.