Temporary Grassing: Mississippi winning bid prices

The low bidder priced temporary grassing at a median $1,335 per acre over the last 12 months (24 contracts), up 27% from the year before and up 43% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,335
24 contracts
Median, prior 12 months
$1,052
21 contracts
Median, 2020
$933
14 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$500$1,000$1,500$2,0002020202120222023202420252026*$1,458
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000110100
Does quantity matter?Median winning price by quantity band
$0$500$1,000$1,500$2,000$2,000≤2$1,1202–7$1,0007–20$980>20

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery1 ACRE$1,650–1
Oct 27, 2026Construction project, Madison CountyMadison111 ACRE$1,094$1,0943
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren19 ACRE$1,415$1,4153
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin11 ACRE$1,000$1,0444
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson13 ACRE$1,062–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin65 ACRE$1,085$1,1286
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha6 ACRE$2,060–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike4 ACRE$1,096$1,1753
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie24 ACRE$1,250$1,3196
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba1 ACRE$2,000$2,6004
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee3 ACRE$1,500$1,5008
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest2 ACRE$2,000$1,9173
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison2 ACRE$2,500$2,5003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee1 ACRE$2,500$2,5005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto6 ACRE$1,750$1,7506
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake4 ACRE$1,205$1,0318
May 27, 2026Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison10 ACRE$1,255$1,2555
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin7 ACRE$500$6752
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee4 ACRE$2,500$2,5632
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette3 ACRE$1,000$1,7525

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.