The low bidder priced exploration at a median $1.00 per linear foot over the last 12 months (2 contracts), flat from the year before and flat since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 60 LF | $1.00 | – | 1 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 210 LF | $1.00 | $1.00 | 6 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 90 LF | $1.00 | $1.00 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 410 LF | $1.00 | $58.00 | 2 |
| Jan 31, 2024 | Bridge Replacement on USJackson | 80 LF | $1.00 | $1.00 | 5 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 120 LF | $15.75 | $8.38 | 2 |
| Sep 27, 2023 | Construction project, Jackson CountyJackson | 100 LF | $1.00 | $1.00 | 3 |
| Aug 22, 2023 | Bridge Replacements on USFranklin | 150 LF | $1.00 | $1.00 | 2 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 230 LF | $1.00 | $1.13 | 2 |
| May 24, 2022 | Bridge Replacement on SRJackson | 100 LF | $1.00 | $1.05 | 4 |
| Mar 2, 2022 | Construction project, Calhoun CountyCalhoun | 180 LF | $155 | $5.54 | 6 |
| Feb 23, 2022 | Bridge Replacement on SRHinds | 100 LF | $11.00 | $6.00 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 20 LF | $278 | $139 | 2 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 60 LF | $150 | – | 2 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 120 LF | $1.00 | – | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.