BidCrew Data
BidCrew Data / Mississippi / Prices / 22" x 13" Concrete Arch Pipe End Section
MDOT pay item · 603-CF002

22" x 13" Concrete Arch Pipe End Section: Mississippi winning bid prices

The low bidder priced 22" x 13" concrete arch pipe end section at a median $1,374 per each over the last 12 months (2 contracts), up 9% from the year before and up 24% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,374
2 contracts
Median, prior 12 months
$1,255
4 contracts
Median, 2020
$1,110
2 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$1,000$2,000$3,000$4,000$5,0002020202120222023202420252026*$1,647
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000110
Does quantity matter?Median winning price by quantity band
$0$500$1,000$1,500$1,080≤1$9201–2$1,5002–4$1,250>4

The last 18 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Apr 28, 2026I-10 Jackson County Welcome CenterJackson4 EA$1,647$1,4134
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington1 EA$1,100$1,1024
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette3 EA$1,500$1,5003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison62 EA$1,300$1,3003
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson1 EA$1,060$1,1005
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren4 EA$1,210$1,3003
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren2 EA$3,650$4,2752
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah9 EA$1,250$1,5252
Jan 24, 2024Intersection Improvements at SRSmith1 EA$1,800$1,3605
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison1 EA$1,182$1,1412
Aug 1, 2023Construction project, Pontotoc CountyPontotoc6 EA$900$1,0002
Jul 27, 2022Overlay approximatelyChickasaw1 EA$4,180$4,0902
Nov 23, 2021Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington1 EA$880$8902
Jun 22, 2021Intersection Improvements on USJefferson1 EA$1,000$9542
Apr 27, 2021Bridge Replacement on SRMarshall2 EA$920–2
Apr 27, 2021Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne1 EA$650–4
Oct 27, 2020Construction project, Neshoba CountyNeshoba4 EA$1,500$1,2353
May 27, 2020Construction project, Marion CountyMarion2 EA$720–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access