The low bidder priced 6" non-perforated sewer pipe for underdrains, sdr 23.5 at a median $30.92 per linear foot over the last 12 months (1 contracts) and up 24% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Nov 25, 2025 | Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe | 110 LF | $30.92 | $31.09 | 4 |
| Oct 10, 2024 | Emergency Slide Repair on US 80 in ForestScott | 47 LF | $52.00 | $63.50 | 2 |
| May 29, 2024 | Construction project, Madison CountyMadison | 124 LF | $88.00 | $105 | 2 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 100 LF | $45.00 | $55.00 | 2 |
| Jun 27, 2023 | Slide Repair at the SR 25 / SRRankin | 88 LF | $38.00 | $37.50 | 4 |
| Oct 5, 2022 | Construction project, Hinds CountyHinds | 180 LF | $22.00 | – | 1 |
| Sep 28, 2022 | Slide Repairs on SRScott | 70 LF | $25.00 | – | 1 |
| Sep 28, 2022 | Slide Repairs at various locations along SRLeake, Scott | 40 LF | $32.50 | – | 1 |
| Aug 23, 2022 | Construction projectDistrict ? | 210 LF | $23.00 | $49.00 | 2 |
| Oct 26, 2021 | Construction project, Hinds CountyHinds | 240 LF | $50.00 | $46.00 | 3 |
| Jul 22, 2021 | Slide Repair on SR 41 approximately 550 feet North of the SR 41 & SRPontotoc | 367 LF | $20.00 | $25.00 | 5 |
| Jun 22, 2021 | Overlay approximatelyRankin | 120 LF | $35.00 | $35.00 | 3 |
| Sep 29, 2020 | Construction project, Itawamba CountyItawamba | 35 LF | $39.10 | $44.55 | 2 |
| Sep 22, 2020 | Construction project, Adams CountyAdams | 140 LF | $25.00 | $20.00 | 8 |
| Apr 17, 2020 | Construction project, Prentiss & Tippah CountyPrentiss, Tippah | 100 LF | $23.00 | $25.50 | 4 |
| Apr 17, 2020 | Construction project, Chickasaw CountyChickasaw | 120 LF | $25.00 | $28.27 | 4 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 2.5K LF | $22.57 | $17.52 | 3 |
| Jan 28, 2020 | Construction project, Holmes CountyHolmes | 40 LF | $63.00 | $44.00 | 4 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.