MDOT let 2 contracts worth $1.5M at the low bid, with 3.00 bidders per contract (the 12-month average is 3.70). Century Construction Group, Inc. won the most, $1.1M; 2 firms won at least one contract. The closest finish: Construction project, Itawamba County, decided by 8.9% ($94K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Construction project, Itawamba CountyItawamba · Construction & widening · 108056301 | Century Construction Group, Inc.2nd: Phillips Contracting Co., Inc. | $1.1M | $1.2M | 8.9% | 2 | −3.0% |
| 2 | Slide Repair on West side of SRPontotoc · Construction & widening · 108095301 | Ste-Bil Grading Inc.2nd: Xcavators, Inc. | $393K | $436K | 10.8% | 4 | −31.4% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.