The low bidder priced saw cut, type i at a median $7.00 per linear foot over the last 12 months (23 contracts), up 17% from the year before and down 11% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 295 LF | $6.50 | $6.50 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 302 LF | $13.00 | $13.15 | 6 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 364 LF | $6.60 | $7.80 | 4 |
| Sep 22, 2026 | Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn | 481 LF | $7.00 | $10.00 | 7 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 123 LF | $6.50 | $6.50 | 3 |
| Aug 25, 2026 | US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma | 230 LF | $15.00 | $7.13 | 6 |
| Aug 21, 2026 | Emergency Bridge Repair on I-55 over SR 32 (Bridge No. 226.7B)Yalobusha | 112 LF | $15.00 | $13.00 | 5 |
| Jul 28, 2026 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo | 324 LF | $11.00 | $8.75 | 8 |
| May 27, 2026 | Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola | 672 LF | $12.00 | $12.00 | 5 |
| May 27, 2026 | Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake | 986 LF | $6.00 | $6.00 | 4 |
| May 27, 2026 | Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo | 1.2K LF | $6.00 | $6.00 | 4 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 1.2K LF | $6.00 | $6.00 | 2 |
| Apr 28, 2026 | Ultra-Thin Overlay & Safety Improvements on approximately 8 miles of existing SR 482 from Neshoba | 720 LF | $6.00 | $6.05 | 4 |
| Apr 28, 2026 | OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin | 3.3K LF | $6.00 | $6.00 | 3 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 1.7K LF | $6.27 | $6.57 | 3 |
| Feb 24, 2026 | Mill & Overlay approximately 9.8 miles of SR 25 from Renfroe to the Attala County LineLeake | 3.5K LF | $6.00 | $6.00 | 5 |
| Feb 24, 2026 | Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower | 1.5K LF | $10.00 | $7.00 | 7 |
| Nov 25, 2025 | Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette | 166 LF | $10.00 | $7.90 | 6 |
| Oct 28, 2025 | Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 oDeSoto, Marshall | 2.0K LF | $13.20 | $10.00 | 5 |
| Oct 28, 2025 | Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1)Noxubee | 554 LF | $6.50 | $11.50 | 6 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.