The low bidder priced 44" x 27" concrete arch pipe end section at a median $3,728 per each over the last 12 months (1 contracts), up 49% from the year before and up 46% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2 EA | $3,728 | $3,101 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 4 EA | $2,250 | $2,250 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 6 EA | $2,750 | $2,550 | 2 |
| Oct 22, 2024 | Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo | 2 EA | $2,445 | – | 1 |
| Jul 23, 2024 | Overlay approximatelyLamar | 1 EA | $5,000 | $4,500 | 2 |
| May 29, 2024 | Construction project, Madison CountyMadison | 2 EA | $3,120 | $3,810 | 2 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 13 EA | $3,000 | $3,130 | 2 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 2 EA | $5,200 | – | 1 |
| Dec 5, 2023 | Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison | 18 EA | $2,391 | $2,520 | 2 |
| Aug 22, 2023 | Construction project, Harrison CountyHarrison | 2 EA | $2,600 | $2,473 | 2 |
| Feb 28, 2023 | Bridge Replacement on SRMadison | 2 EA | $2,850 | $3,325 | 5 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 6 EA | $2,950 | $2,453 | 2 |
| Feb 23, 2022 | Construction project, Calhoun CountyCalhoun | 1 EA | $2,260 | $3,300 | 5 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 5 EA | $2,750 | $1,881 | 3 |
| Jun 11, 2020 | Slide Repair on SR 822, 1.8 miles East of SRWarren | 1 EA | $2,200 | $2,000 | 4 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 4 EA | $2,560 | $3,065 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.