BidCrew Data
BidCrew Data / Mississippi / Lettings / Jun 11, 2020
MDOT letting · Emergency

June 11, 2020 MDOT letting: 3 contracts, $2.4M

MDOT let 3 contracts worth $2.4M at the low bid, with 3.67 bidders per contract (the 12-month average is 3.70). Century Construction Group, Inc. won the most, $1.6M; 3 firms won at least one contract. The closest finish: Construction project, decided by 10.1% ($50K).

Awarded at low bid
$2.4M
3 contracts
Bidders per contract
3.67
single-bid 0%
Low bid vs. estimate
−39.0%
median
Low-to-second gap
$977K
median 19.1%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
2Bridge Repairs on County Road · Bridge repair & rehab · 307163301Century Construction Group, Inc.2nd: Southern Road & Bridge, LLC$1.6M$2.5M54.6%2−1.1%
3Construction projectDistrict 6 · Construction & widening · 30718630Holliday Construction, LLC2nd: Looks Great Services of MS, Inc.$499K$550K10.1%5−46.6%
1Slide Repair on SR 822, 1.8 miles East of SRWarren · Construction & widening · 108455301Central Asphalt Co., Inc.2nd: Theobald Construction Services, LLC$285K$340K19.1%4−39.0%

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access