The low bidder priced channel excavation, fm at a median $23.90 per cubic yard over the last 12 months (4 contracts), down 76% from the year before and up 103% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 15K CY | $25.90 | $25.90 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 2.1K CY | $11.80 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 1.7K CY | $31.00 | $51.53 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 1.3K CY | $21.90 | $20.75 | 3 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 1.0K CY | $20.00 | $18.68 | 4 |
| Jan 28, 2025 | Bridge Preservation on SR 25 over Plummer Slough (Bridge No. 12.7)Rankin | 1.7K CY | $179 | – | 1 |
| Oct 22, 2024 | Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren | 4.8K CY | $52.00 | $49.50 | 2 |
| Jun 4, 2024 | Bridge Replacements on USHolmes | 5.4K CY | $8.50 | $12.00 | 7 |
| Jan 24, 2024 | Safety Improvements on approximatelyLowndes | 500 CY | $25.00 | $50.00 | 3 |
| Oct 24, 2023 | Bank Stabilization on I-20 over Clear Creek (Bridge Nos. 12.0A & 12.0B)Warren | 24K CY | $8.01 | – | 2 |
| May 23, 2023 | Construction project, Madison CountyMadison | 850 CY | $15.00 | $15.13 | 4 |
| Apr 25, 2023 | Bridge Replacement on SRCopiah | 3.6K CY | $9.00 | $14.50 | 3 |
| Mar 28, 2023 | Construction project, Union CountyUnion | 1.8K CY | $14.00 | $12.37 | 4 |
| Mar 28, 2023 | Construction project, Union CountyUnion | 371 CY | $14.00 | $14.50 | 4 |
| Jul 27, 2021 | Bridge Preservation on SR 278 over Weaver Creek (Bridge No. 12.0), SRMonroe, Pontotoc | 1.2K CY | $26.00 | $26.00 | 5 |
| Mar 23, 2021 | Construction project, Pontotoc CountyPontotoc | 12K CY | $12.50 | $10.25 | 2 |
| Apr 28, 2020 | Bridge Replacements on SRLeake | 1.2K CY | $11.80 | – | 1 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.