The low bidder priced 24" reinforced concrete end section at a median $1,311 per each over the last 12 months (16 contracts), down 18% from the year before and up 38% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 20 EA | $1,209 | $1,800 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 2 EA | $1,200 | $2,678 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 3 EA | $1,500 | $1,425 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 1 EA | $1,151 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 13 EA | $1,297 | $1,361 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 3 EA | $2,750 | – | 4 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 4 EA | $1,150 | $1,411 | 6 |
| Aug 25, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren | 2 EA | $2,600 | $3,210 | 3 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 4 EA | $1,325 | $1,325 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 4 EA | $1,200 | $2,025 | 6 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 1 EA | $1,500 | $1,931 | 2 |
| May 8, 2026 | Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper | 2 EA | $1,191 | $1,191 | 3 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 5 EA | $1,250 | $1,300 | 5 |
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 6 EA | $2,408 | $1,705 | 4 |
| Feb 24, 2026 | Mill & Overlay approximately 9 miles of SR 397 from the Kemper County Line to Robertson RoWinston | 3 EA | $2,750 | $2,750 | 4 |
| Nov 25, 2025 | Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe | 2 EA | $2,500 | $1,850 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 31 EA | $1,500 | $1,575 | 3 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 3 EA | $2,688 | $1,863 | 3 |
| Aug 26, 2025 | Copi Construction of Equipment Shed & Material Shed, and Lot Improvements in the Copiah CoCopiah | 4 EA | $1,000 | $1,166 | 4 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 3 EA | $1,600 | $1,600 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.