24" Reinforced Concrete End Section: Mississippi winning bid prices

The low bidder priced 24" reinforced concrete end section at a median $1,311 per each over the last 12 months (16 contracts), down 18% from the year before and up 38% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,311
16 contracts
Median, prior 12 months
$1,600
14 contracts
Median, 2020
$950
7 contracts
Winner vs. field
2% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$500$1,000$1,500$2,000$2,500$3,0002020202120222023202420252026*$1,297
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000110
Does quantity matter?Median winning price by quantity band
$0$500$1,000$1,500$2,000$1,500≤2$1,5502–3$1,3253–6$1,297>6

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison20 EA$1,209$1,8003
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren2 EA$1,200$2,6783
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin3 EA$1,500$1,4254
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson1 EA$1,151–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin13 EA$1,297$1,3616
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha3 EA$2,750–4
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie4 EA$1,150$1,4116
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren2 EA$2,600$3,2103
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest4 EA$1,325$1,3253
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto4 EA$1,200$2,0256
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin1 EA$1,500$1,9312
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper2 EA$1,191$1,1913
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette5 EA$1,250$1,3005
Apr 28, 2026I-10 Jackson County Welcome CenterJackson6 EA$2,408$1,7054
Feb 24, 2026Mill & Overlay approximately 9 miles of SR 397 from the Kemper County Line to Robertson RoWinston3 EA$2,750$2,7504
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe2 EA$2,500$1,8504
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette31 EA$1,500$1,5753
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln3 EA$2,688$1,8633
Aug 26, 2025Copi Construction of Equipment Shed & Material Shed, and Lot Improvements in the Copiah CoCopiah4 EA$1,000$1,1664
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison3 EA$1,600$1,6003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access