The low bidder priced removal of asphalt driveways, all depths at a median $10.68 per square yard over the last 12 months (4 contracts), down 36% from the year before and up 33% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 457 SY | $5.31 | – | 1 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 47 SY | $11.35 | $13.50 | 8 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 184 SY | $30.00 | $30.75 | 2 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 643 SY | $10.00 | $20.00 | 5 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 15K SY | $10.00 | $15.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 458 SY | $8.00 | $50.00 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 519 SY | $20.00 | $14.18 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 142 SY | $27.50 | $15.75 | 5 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 231 SY | $18.25 | $23.60 | 3 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 991 SY | $15.00 | $13.25 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 301 SY | $20.00 | $16.75 | 4 |
| Jul 23, 2024 | Overlay approximatelyChickasaw | 140 SY | $30.00 | $32.00 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 3.9K SY | $15.00 | $18.00 | 2 |
| Jan 31, 2024 | Bridge Replacements on SR 395 between SRWinston | 36 SY | $100 | $57.80 | 2 |
| Jan 24, 2024 | Construction project, Harrison CountyHarrison | 1.1K SY | $12.00 | – | 1 |
| Dec 5, 2023 | Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River | 5.6K SY | $5.50 | $8.00 | 5 |
| Dec 5, 2023 | Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison | 6.8K SY | $5.42 | $14.21 | 2 |
| Sep 27, 2023 | Construction project, Jackson CountyJackson | 102 SY | $34.00 | $15.00 | 3 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 1.1K SY | $8.00 | $10.25 | 2 |
| Feb 28, 2023 | Bridge Replacement on SRMadison | 136 SY | $18.00 | $22.50 | 5 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.