The low bidder priced temporary slope drains at a median $12.00 per linear foot over the last 12 months (9 contracts), up 62% from the year before and up 12% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2.0K LF | $0.050 | $14.10 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 1.0K LF | $11.80 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 1.0K LF | $16.00 | $15.50 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 640 LF | $0.010 | $18.00 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 60 LF | $12.00 | $20.00 | 6 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 700 LF | $15.00 | $14.00 | 8 |
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 292 LF | $19.00 | $19.00 | 5 |
| Feb 3, 2026 | Slide Repair on US 61 Southbound across from Fire Tower RoadAdams | 300 LF | $5.00 | $16.50 | 4 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 1.0K LF | $27.50 | $23.25 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 18K LF | $9.50 | $9.50 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 5.2K LF | $6.80 | $17.25 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 8.5K LF | $10.00 | $14.03 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 1.3K LF | $0.010 | $18.00 | 5 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 480 LF | $8.00 | $14.00 | 5 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 500 LF | $0.010 | $15.00 | 3 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 500 LF | $15.00 | $15.00 | 4 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 1.0K LF | $18.00 | $14.00 | 3 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 2.2K LF | $9.00 | $11.50 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 815 LF | $5.00 | $12.60 | 7 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 7.0K LF | $17.00 | $23.50 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.