BidCrew Data
BidCrew Data / Mississippi / Prices / 6" Thermoplastic Traffic Stripe, Continuous White
MDOT pay item · 907-626-B005

6" Thermoplastic Traffic Stripe, Continuous White: Mississippi winning bid prices

The low bidder priced 6" thermoplastic traffic stripe, continuous white at a median $3.25 per linear foot over the last 12 months (18 contracts) and flat since 2026.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$3.25
18 contracts
Median, prior 12 months
–
Median, 2026
$3.25
18 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2$3$4$5$62020202120222023202420252026*$3.25
Price vs. quantityEvery winning price since 2020 (log scale)
$0$5$10$15$201.0K10K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$5.80≤601$3.92601–1.4K$4.751.4K–3.0K$1.75>3.0K

The last 18 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin20K LF$1.67$2.234
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin5.7K LF$4.00$4.286
Sep 22, 2026Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union400 LF$11.15$11.506
Sep 22, 2026Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington724 LF$5.50$5.384
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn315 LF$5.80$5.507
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike8.0K LF$1.65$1.803
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey1.7K LF$5.50$5.503
Aug 25, 2026US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma424 LF$2.20$17.556
Aug 21, 2026Emergency Bridge Repair on I-55 over SR 32 (Bridge No. 226.7B)Yalobusha170 LF$23.50$20.005
Jul 28, 2026Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar840 LF$2.20$2.204
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison1.1K LF$2.34$2.073
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee2.2K LF$4.00$4.005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto4.8K LF$2.50$2.636
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake2.9K LF$5.65$5.338
May 27, 2026Bridge Repair on I-55 over Star Landing Road (Bridge Nos. 285.9A & 285.9B)DeSoto720 LF$11.00$11.007
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin3.0K LF$1.75$1.882
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee1.8K LF$1.50$1.502
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette561 LF$2.00$2.005

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access