The low bidder priced reinforcement, corrosion resistant at a median $3.40 per pound over the last 12 months (6 contracts), up 10% from the year before and up 94% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 22K LBS | $3.55 | $4.05 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 2.6K LBS | $4.25 | – | 1 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 11K LBS | $3.24 | $4.00 | 6 |
| Jul 28, 2026 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo | 3.1K LBS | $6.65 | $4.00 | 5 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 2.2K LBS | $3.25 | $3.20 | 8 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 3.3K LBS | $2.90 | $3.50 | 7 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 62K LBS | $3.22 | $3.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 46K LBS | $2.95 | $3.40 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 20K LBS | $3.50 | $3.63 | 2 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 5.8K LBS | $2.60 | $2.97 | 5 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 2.8K LBS | $3.00 | $3.25 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 2.9K LBS | $3.00 | $4.63 | 4 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 6.1K LBS | $3.40 | $3.23 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 2.5K LBS | $4.00 | $4.24 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 9.5K LBS | $2.80 | $3.00 | 7 |
| Jan 31, 2024 | Bridge Replacement on USJackson | 5.5K LBS | $3.60 | $3.60 | 5 |
| Jan 31, 2024 | Construction project, Choctaw CountyChoctaw | 3.7K LBS | $3.50 | $3.50 | 5 |
| Jan 31, 2024 | Bridge Replacements on SR 395 between SRWinston | 2.6K LBS | $4.00 | $3.52 | 2 |
| Jan 24, 2024 | Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock | 3.6K LBS | $4.90 | $4.00 | 3 |
| Dec 5, 2023 | Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River | 19K LBS | $2.80 | $2.80 | 5 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.