BidCrew Data / Mississippi / Prices / Electric Cable, Underground in Conduit, IMSA 20-1, AWG 14, 8 Conductor
MDOT pay item · 907-636-B016

Electric Cable, Underground in Conduit, IMSA 20-1, AWG 14, 8 Conductor: Mississippi winning bid prices

The low bidder priced electric cable, underground in conduit, imsa 20-1, awg 14, 8 conductor at a median $3.95 per linear foot over the last 12 months (5 contracts), up 1% from the year before and up 108% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$3.95
5 contracts
Median, prior 12 months
$3.90
5 contracts
Median, 2020
$1.90
1 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1$2$3$4$52020202120222023202420252026*$3.95
Price vs. quantityEvery winning price since 2020 (log scale)
$0$2$4$6$8$101001.0K10K
Does quantity matter?Median winning price by quantity band
$0$1$2$3$4$3.73≤686$3.60686–1.1K$3.201.1K–3.3K$3.55>3.3K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison915 LF$3.95$3.763
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin5.4K LF$3.50$3.506
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest6.6K LF$5.00$5.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee685 LF$3.00$3.705
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee2.1K LF$4.00$4.002
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette10K LF$2.50$2.503
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison31K LF$3.75$4.103
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson365 LF$4.65$3.902
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison379 LF$4.00$4.752
Nov 26, 2024Intersection Improvements on US 49 at SR 35Covington1.0K LF$3.90$3.653
Jul 11, 2024Construction project, Madison CountyMadison1.4K LF$1.77$1.753
Jun 11, 2024Construction project, Lafayette CountyLafayette1.1K LF$4.00$4.705
May 29, 2024Traffic Signal Installation on US 49W at SRSunflower390 LF$3.00$3.502
Jan 31, 2024Intersection Improvements on USDeSoto900 LF$2.30$1.104
Jan 24, 2024Intersection Improvements at SRSmith745 LF$4.20$4.155
Jan 24, 2024Construction project, Harrison CountyHarrison2.4K LF$4.64–1
Dec 5, 2023Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River735 LF$3.60$3.605
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison3.6K LF$4.21$4.112
Aug 22, 2023Intersection Improvements on USMadison685 LF$3.85$4.553
Aug 1, 2023Construction project, Pontotoc CountyPontotoc1.6K LF$3.20$3.202

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.