The low bidder priced installation and removal of guardrail, terminal end section at a median $4,825 per each over the last 12 months (2 contracts), up 211% from the year before and up 206% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 4 EA | $5,723 | – | 1 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 4 EA | $3,927 | $4,019 | 6 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 14 EA | $1,300 | $1,400 | 2 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 4 EA | $1,800 | $2,045 | 5 |
| Oct 22, 2024 | Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren | 6 EA | $4,900 | $6,160 | 2 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 4 EA | $2,500 | $2,610 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 12 EA | $1,875 | $2,000 | 7 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 3 EA | $4,110 | $3,905 | 2 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 4 EA | $3,000 | $3,000 | 2 |
| Apr 25, 2023 | Bridge Replacement on SRCopiah | 4 EA | $2,940 | $2,785 | 3 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 6 EA | $3,600 | $3,950 | 2 |
| Mar 2, 2022 | Construction project, Calhoun CountyCalhoun | 4 EA | $3,600 | $3,727 | 6 |
| Feb 23, 2022 | Construction project, Calhoun CountyCalhoun | 4 EA | $2,600 | $2,500 | 5 |
| Jan 25, 2022 | Construction project, Hinds CountyHinds | 4 EA | $1,700 | $1,765 | 6 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 1 EA | $3,350 | – | 2 |
| May 25, 2021 | Construction project, Madison CountyMadison | 4 EA | $2,108 | $2,108 | 5 |
| Apr 28, 2020 | Bridge Replacements on SRLeake | 12 EA | $1,575 | – | 1 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.