The low bidder priced 6" thermoplastic double drop edge stripe, continuous white at a median $4.40 per linear foot over the last 12 months (9 contracts), up 1% from the year before and down 14% since 2024.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 2.4K LF | $2.35 | $2.33 | 4 |
| Feb 3, 2026 | Slide Repair on US 61 Southbound across from Fire Tower RoadAdams | 1.2K LF | $10.00 | $11.25 | 4 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 1.6K LF | $2.95 | $2.95 | 5 |
| Nov 25, 2025 | Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette | 780 LF | $16.00 | $16.75 | 6 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 5.3K LF | $1.90 | $1.95 | 7 |
| Nov 25, 2025 | Bridge Repair on SR 3 over Short Creek, Bridge No. 32.7Yazoo | 500 LF | $17.00 | $16.50 | 5 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 10.0K LF | $2.50 | $2.27 | 4 |
| Oct 28, 2025 | Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 oDeSoto, Marshall | 4.7K LF | $4.40 | $4.40 | 5 |
| Oct 28, 2025 | Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1)Noxubee | 598 LF | $11.00 | $11.50 | 6 |
| Sep 23, 2025 | Bridge Repair on Peyton Road over I-55 (Bridge No.270.2)Tate | 700 LF | $10.00 | $11.00 | 6 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 3.7K LF | $2.00 | $2.19 | 4 |
| Sep 4, 2025 | Bridge Repairs on Old US 11 over I-59 (Bridge No. 47.9) & Richburg Road over I-59 (Bridge Lamar | 1.6K LF | $5.50 | $5.50 | 5 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 8.7K LF | $2.90 | $3.00 | 3 |
| Aug 26, 2025 | Bridge Preventive Maintenance on SR 528 over I-59 (Bridge No. 20.3)Jasper | 508 LF | $11.00 | $11.50 | 5 |
| Aug 26, 2025 | Remove & Replace High Friction Surface Treatment (Bridge Nos. 96.3A & 96.3B) on I-55 northHinds | 3.0K LF | $9.00 | $7.00 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 7.4K LF | $2.00 | $1.80 | 3 |
| Jul 22, 2025 | Bridge Repair on West Whitworth Street over I-55 (Bridge No. 60.0)Copiah | 608 LF | $8.80 | $8.90 | 2 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 14K LF | $1.90 | $2.20 | 3 |
| Apr 22, 2025 | Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison | 2.9K LF | $3.75 | $4.13 | 2 |
| Mar 25, 2025 | Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin | 694 LF | $5.70 | $6.25 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.