The low bidder priced reinforcing steel at a median $3.15 per pound over the last 12 months (24 contracts), up 26% from the year before and up 9% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$3.15
24 contracts
Median, prior 12 months
$2.50
21 contracts
Median, 2020
$2.90
18 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1$2$3$4$52020202120222023202420252026*$3.40
Price vs. quantityEvery winning price since 2020 (log scale)
$0$2.5$5$7.5$10$12.5101001.0K10K100K1.0M
Does quantity matter?Median winning price by quantity band
$0$1$2$3$4$3.88≤267$3.30267–1.5K$2.851.5K–15K$1.73>15K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery54 LBS$3.30–1
Oct 27, 2026Construction project, Madison CountyMadison49K LBS$1.70$2.753
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren6.0K LBS$7.60$7.273
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin19K LBS$2.00$2.084
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson7.0K LBS$2.66–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin31K LBS$1.50$2.176
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha2.6K LBS$3.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike56K LBS$1.85$2.103
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie260 LBS$2.00$2.676
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba1.2K LBS$5.00$4.084
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest912 LBS$6.00$3.053
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison1.8K LBS$5.50$4.663
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee170 LBS$3.50$4.305
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto18K LBS$2.00$1.956
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake200 LBS$5.00$3.514
May 27, 2026Overlay approximately 11.4 miles of SR 15 from Ovett-Scarbrough Road to south of Tuckers CJones54 LBS$8.00$4.652
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin217 LBS$5.00$3.752
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette476 LBS$2.50$3.005
Apr 28, 2026I-10 Jackson County Welcome CenterJackson2.0K LBS$4.15$4.034
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams15K LBS$4.00$3.274

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.