MDOT pay item · 225-A001

Grassing: Mississippi winning bid prices

The low bidder priced grassing at a median $1,855 per acre over the last 12 months (28 contracts), up 58% from the year before and up 24% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,855
28 contracts
Median, prior 12 months
$1,173
22 contracts
Median, 2020
$1,500
20 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$500$1,000$1,500$2,000$2,500$3,0002020202120222023202420252026*$1,810
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000$5,000110100
Does quantity matter?Median winning price by quantity band
$0$500$1,000$1,500$2,000$2,500$2,200≤2$1,2502–6$1,1656–17$1,200>17

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery1 ACRE$3,850–1
Oct 27, 2026Construction project, Madison CountyMadison111 ACRE$1,367$1,3673
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren19 ACRE$905$1,5503
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin11 ACRE$2,000$1,6534
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson13 ACRE$1,298–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin65 ACRE$1,275$1,3256
Sep 22, 2026Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe3 ACRE$4,550$4,0006
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha6 ACRE$3,250–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike3 ACRE$1,331$1,3313
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie24 ACRE$1,950$1,9506
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee3 ACRE$1,500$2,2508
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest2 ACRE$1,900$1,9003
Jul 28, 2026Bank Stabilization on SR 12 over Big Black River (Bridge No. 83.4)Holmes, Attala2 ACRE$980$2,17510
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison2 ACRE$1,600$1,6003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee1 ACRE$4,500$4,5005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto6 ACRE$2,800$2,8006
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake4 ACRE$1,810$1,3998
May 27, 2026Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison10 ACRE$2,283$2,2835
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin7 ACRE$3,000$2,0002
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper2 ACRE$4,647$2,5003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access