Tie Bars, No. 5 Deformed Drilled and Epoxied or Grouted: Mississippi winning bid prices

The low bidder priced tie bars, no. 5 deformed drilled and epoxied or grouted at a median $7.50 per each over the last 12 months (10 contracts), down 33% from the year before and down 50% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$7.50
10 contracts
Median, prior 12 months
$11.15
5 contracts
Median, 2020
$15.00
5 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$5$10$15$20$252020202120222023202420252026*$7.50
Price vs. quantityEvery winning price since 2020 (log scale)
$0$10$20$30$40101001.0K10K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$20$19.32≤67$11.1867–156$10.00156–414$8.75>414

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell InterchangeLauderdale74 EA$7.00–1
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke26 EA$5.00$5.652
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River40 EA$8.00–1
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren1.5K EA$10.85$11.003
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin86 EA$5.50$21.006
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren551 EA$5.00$6.203
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison10 EA$16.50$15.752
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee519 EA$15.00$15.382
Apr 28, 2026OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin116 EA$5.00$5.003
Feb 24, 2026Overlay approximately 5.3 miles of SR 27 from 0.2 mile south of Old Highway 27 to 0.35 milCopiah248 EA$12.50$12.505
Jul 22, 2025Mill & Overlay approximately 3 miles of US 98 from 400 feet west of Weathersby Drive to thLamar, Forrest49 EA$14.00$13.002
Apr 30, 2025Mill & Overlay & Concrete Rehabilitation on approximately 2 miles of SR 25 from the BOSM tHinds70 EA$8.50$8.503
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton427 EA$17.50–1
Mar 25, 2025Concrete Pavement Rehabilitation on approximately 2.3 miles of US 82 through IndianolaSunflower15K EA$11.15$5.503
Feb 25, 2025Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott CouRankin79 EA$7.32$7.323
Oct 22, 2024Remove and Replace OGFC on approximately 20 miles of I-59 from North of Rocky Creek to theJones73 EA$14.00–1
Sep 25, 2024Overlay approximatelyKemper853 EA$7.35$7.353
Jul 30, 2024Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo252 EA$20.00$20.003
Jun 25, 2024Intersection Improvements on USRankin52 EA$15.00$15.502
May 29, 2024Overlay approximatelyClarke52 EA$15.00–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access