BidCrew Data / Mississippi / Prices / Removal of Guard Rail Including Post, Blockouts & Hardware
MDOT pay item · 202-B150

Removal of Guard Rail Including Post, Blockouts & Hardware: Mississippi winning bid prices

The low bidder priced removal of guard rail including post, blockouts & hardware at a median $5.86 per linear foot over the last 12 months (14 contracts), up 16% from the year before and down 31% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$5.86
14 contracts
Median, prior 12 months
$5.05
9 contracts
Median, 2020
$8.50
7 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2.5$5$7.5$10$12.5$152020202120222023202420252026*$6.22
Price vs. quantityEvery winning price since 2020 (log scale)
$0$5$10$15$20$251001.0K10K
Does quantity matter?Median winning price by quantity band
$0$2.5$5$7.5$10$10.00≤541$9.00541–1.0K$8.501.0K–2.0K$8.15>2.0K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison4.7K LF$5.50$5.503
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn470 LF$4.10$10.007
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie1.8K LF$5.24$5.416
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee678 LF$5.00$4.908
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo800 LF$4.50$4.758
Jun 23, 2026Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Northern ErviLawrence512 LF$8.46$8.384
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones CoCovington1.7K LF$6.22$7.253
May 8, 2026Seal & Overlay approximately 16 miles of MS 501 from SR 18 to the Scott County LineSmith700 LF$8.00$8.144
Apr 28, 2026Overlay approximately 11.2 miles on MS 550 from the Jefferson County Line to east of BouieLincoln1.8K LF$8.46$8.003
Apr 28, 2026OGFC Lift on I-55 from the Mississippi State Line to MS 568Pike22K LF$7.41$7.462
Mar 24, 2026Overlay approximately 11.7 miles of MS 27 from US 84 to the Copiah County LineLawrence2.2K LF$5.00$5.084
Mar 24, 2026Mill & Overlay approximately 4.2 miles of US 84 from Bude to the Homochitto River BridgeFranklin3.2K LF$6.22$6.213
Feb 24, 2026Mill & Overlay approximately 9 miles of SR 397 from the Kemper County Line to Robertson RoWinston1.3K LF$7.00$7.004
Nov 25, 2025Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith952 LF$2.30$2.507
Sep 23, 2025Bridge Replacement on SR 704 (Bridge No. 162.5)Benton470 LF$10.00$7.164
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison6.4K LF$3.50$3.533
Jul 22, 2025Mill & Overlay approximately 5.5 miles of SR 25 from 1.3 miles north of Platsburg Road to Winston600 LF$5.00$5.132
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton2.2K LF$5.00$5.503
May 28, 2025Overlay approximately 8 miles of US 84 from Chambers Road to Middle Fork CreekFranklin800 LF$4.15$4.162
Mar 25, 2025Bridge Repair on SR 149 over Unnamed Stream (Bridge No. 108.1)Covington379 LF$11.00$10.003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.