The low bidder priced 12.5-mm, st, asphalt pavement at a median $180 per ton over the last 12 months (16 contracts), down 2% from the year before and up 64% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River | 90 TON | $325 | – | 1 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 652 TON | $226 | $235 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 313 TON | $194 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 4.5K TON | $168 | $176 | 6 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 2.3K TON | $173 | $177 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 96 TON | $265 | $292 | 4 |
| Jul 28, 2026 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds | 125 TON | $343 | $384 | 3 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 618 TON | $192 | $196 | 8 |
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 284 TON | $187 | $185 | 5 |
| May 27, 2026 | Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo | 6.8K TON | $122 | $123 | 4 |
| Apr 28, 2026 | Ultra-Thin Overlay & Safety Improvements on approximately 8 miles of existing SR 482 from Neshoba | 1.3K TON | $165 | $233 | 4 |
| Apr 28, 2026 | OGFC Lift on I-55 from the Mississippi State Line to MS 568Pike | 14 TON | $300 | $395 | 2 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 11K TON | $113 | $121 | 3 |
| Feb 24, 2026 | Mill & Overlay approximately 3 miles of MS 487 from east of Tuscolameta Big Canal to SR 35Leake | 5.0K TON | $133 | $135 | 5 |
| Feb 24, 2026 | Mill & Overlay approximately 3.4 miles of SR 854 from SR 39 to the Naval Air StationLauderdale | 1.8K TON | $173 | $175 | 3 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 1.2K TON | $152 | $150 | 7 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 3.8K TON | $173 | $173 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 5.0K TON | $173 | $175 | 3 |
| Jun 24, 2025 | Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson | 50 TON | $233 | $316 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 959 TON | $162 | $170 | 5 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.