The low bidder priced 6" thermoplastic traffic stripe, continuous yellow at a median $5.50 per linear foot over the last 12 months (21 contracts), up 3% from the year before and down 3% since 2025.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 20K LF | $1.67 | $2.23 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 11K LF | $2.07 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 4.2K LF | $4.00 | $4.28 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 200 LF | $11.15 | $11.50 | 6 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 322 LF | $5.50 | $5.38 | 4 |
| Sep 22, 2026 | Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn | 315 LF | $5.80 | $5.50 | 7 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 8.5K LF | $1.65 | $1.80 | 3 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 1.3K LF | $6.00 | $5.88 | 4 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 1.7K LF | $5.50 | $5.50 | 3 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 790 LF | $7.00 | $5.83 | 8 |
| Aug 21, 2026 | Emergency Bridge Repair on I-55 over SR 32 (Bridge No. 226.7B)Yalobusha | 170 LF | $23.50 | $20.00 | 5 |
| Jul 28, 2026 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo | 9.2K LF | $4.50 | $4.00 | 5 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 509 LF | $2.30 | $2.30 | 3 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 1.4K LF | $4.00 | $4.00 | 5 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 2.8K LF | $2.50 | $2.63 | 6 |
| Jun 12, 2026 | Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121Union | 600 LF | $16.50 | $19.38 | 4 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 2.9K LF | $5.65 | $5.33 | 8 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 3.1K LF | $1.75 | $1.88 | 2 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 569 LF | $1.50 | $1.50 | 2 |
| Feb 24, 2026 | Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower | 804 LF | $5.50 | $5.50 | 7 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.