The low bidder priced warning lights, type "b" at a median $143 per each over the last 12 months (38 contracts), down 9% from the year before and down 5% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 22 EA | $135 | $135 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 37 EA | $170 | $160 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 44 EA | $265 | $218 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 37 EA | $23.60 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 374 EA | $142 | $137 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 6 EA | $115 | $115 | 6 |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe | 6 EA | $163 | $163 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 122 EA | $131 | – | 4 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 10 EA | $27.50 | $96.25 | 4 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 30 EA | $137 | $137 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 10 EA | $157 | $183 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 18 EA | $150 | $147 | 4 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 16 EA | $135 | $131 | 3 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 17 EA | $100 | $110 | 8 |
| Aug 25, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren | 20 EA | $128 | $128 | 3 |
| Jul 28, 2026 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo | 25 EA | $140 | $140 | 5 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 116 EA | $160 | $220 | 3 |
| Jul 28, 2026 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo | 4 EA | $142 | $126 | 8 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 6 EA | $100 | $118 | 5 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 8 EA | $100 | $114 | 6 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.