The low bidder priced structural steel angles & bars, 7/16" x 2 1/2" flat bar at a median $4.14 per pound over the last 12 months (3 contracts), up 728% from the year before and up 39% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 60 LBS | $15.00 | $15.00 | 3 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 276 LBS | $2.93 | $2.93 | 3 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 209 LBS | $4.14 | $1.06 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 644 LBS | $0.50 | $0.55 | 2 |
| Jan 24, 2024 | Intersection Improvements at SRSmith | 83 LBS | $7.80 | $4.75 | 5 |
| Jan 24, 2024 | Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock | 106 LBS | $4.00 | $4.00 | 3 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 22 LBS | $5.00 | – | 1 |
| Dec 5, 2023 | Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison | 876 LBS | $5.06 | $4.53 | 2 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 40 LBS | $9.55 | $9.28 | 2 |
| Apr 25, 2023 | Construction project, Wilkinson CountyWilkinson | 114 LBS | $2.30 | $4.95 | 3 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 1.8K LBS | $4.00 | $4.40 | 2 |
| Sep 28, 2022 | Construction project, Clarke CountyClarke | 145 LBS | $5.65 | $5.75 | 3 |
| Jul 27, 2022 | Overlay approximatelySimpson | 195 LBS | $7.50 | – | 1 |
| May 24, 2022 | Overlay approximately 6.5 miles of SRTippah | 137 LBS | $5.00 | $5.00 | 2 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 98 LBS | $6.00 | – | 2 |
| Jul 27, 2021 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones | 2.3K LBS | $5.00 | $5.30 | 2 |
| Jun 22, 2021 | Overlay approximatelyMadison | 75 LBS | $5.00 | $5.00 | 4 |
| May 25, 2021 | Intersection Improvements on USWilkinson | 66 LBS | $3.65 | $4.33 | 2 |
| Apr 27, 2021 | Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne | 208 LBS | $4.75 | – | 4 |
| Mar 2, 2021 | Construction project, Covington CountyCovington | 219 LBS | $5.00 | $5.00 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.