BidCrew Data
BidCrew Data / Mississippi / Prices / Expansion Joints, Without Dowels
MDOT pay item · 501-E001

Expansion Joints, Without Dowels: Mississippi winning bid prices

The low bidder priced expansion joints, without dowels at a median $16.73 per linear foot over the last 12 months (2 contracts), down 67% from the year before and up 28% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$16.73
2 contracts
Median, prior 12 months
$50.00
3 contracts
Median, 2020
$13.07
2 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$50$100$1502020202120222023202420252026*$16.73
Price vs. quantityEvery winning price since 2020 (log scale)
$0$50$100$1501001.0K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$23.00≤74$16.4574–112$15.00112–184$18.45>184

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike112 LF$16.45$17.503
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey75 LF$17.00$15.003
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette11 LF$35.00$58.003
Sep 16, 2025Emergency Bridge Repair on I-59 over Bouie River (Bridge No. 67.7A)Forrest14 LF$200$1122
May 28, 2025Bridge Repairs on SR 32 over Grenada Railroad, LLC, (Bridge No. 67.3), & on Paper Mill RoaYalobusha, Grenada67 LF$50.00$12.003
Oct 22, 2024Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes90 LF$25.00$14.634
Jul 30, 2024Bridge Replacement on SRSunflower89 LF$20.00$20.004
May 29, 2024Construction project, Madison CountyMadison66 LF$16.00$23.002
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison240 LF$35.00–1
Oct 24, 2023Construction project, DeSoto CountyDeSoto431 LF$15.00$20.005
Oct 24, 2023Construction project, DeSoto CountyDeSoto166 LF$15.00$20.005
May 30, 2023Bridge Replacements on SR 397 between SRWinston147 LF$12.00$12.502
Mar 28, 2023Construction project, Union CountyUnion82 LF$10.00$11.254
Oct 25, 2022Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson1.2K LF$20.00$14.752
Sep 28, 2022Construction project, Clarke CountyClarke144 LF$22.55$22.553
Sep 28, 2022Construction project, Jackson CountyJackson375 LF$16.90$15.504
May 24, 2022Bridge Replacement on SRJackson74 LF$20.00$21.254
Feb 23, 2022Construction project, Lincoln CountyLincoln92 LF$12.00–1
Jan 25, 2022Construction project, Hinds CountyHinds62 LF$23.00$21.506
Nov 23, 2021Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington936 LF$21.40$20.702

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access