Removal of Flared End Section, All Sizes: Mississippi winning bid prices

The low bidder priced removal of flared end section, all sizes at a median $500 per each over the last 12 months (7 contracts), down 50% from the year before and down 13% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$500
7 contracts
Median, prior 12 months
$1,000
9 contracts
Median, 2020
$573
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$500$1,000$1,5002020202120222023202420252026*$500
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1,000$2,000$3,000$4,000$5,000110
Does quantity matter?Median winning price by quantity band
$0$250$500$750$1,000$650≤1$1,0001–2$7002–6.25$573>6.25

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren5 EA$345$5003
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin6 EA$500$5374
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall1 EA$1,543$1,2504
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin20 EA$343$8586
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds2 EA$4,500$4,5003
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto7 EA$500$1,1136
Nov 25, 2025Ditch Repair on I-20 near the Springridge Road InterchangeHinds1 EA$1,314$1,1005
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette10 EA$1,000$1,0003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison17 EA$700$7003
Apr 1, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba1 EA$500$5402
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton7 EA$1,500–1
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson13 EA$1,330$5585
Feb 4, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba1 EA$550–1
Jan 28, 2025Wayne Installation of Ramp Gates on I-59 from the Louisiana State Line to north of US 84 &Lincoln, Pike, Forrest, Jones, Lamar, Pearl River, Adams1 EA$4,500$4,5003
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren2 EA$1,360$9853
Nov 26, 2024Pearl River Installation of Median Cable Barrier & Bridge Pier Protection along I-59 from Clarke, Jasper3 EA$1,000–1
Oct 22, 2024Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo6 EA$750–1
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren2 EA$1,070$1,3482
Jul 30, 2024Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo2 EA$1,500$1,5003
Jul 16, 2024Emergency Removal & Replacement of existing pipe located on SRPearl River1 EA$265$7504

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access