BidCrew Data
BidCrew Data / Mississippi / Prices / Borrow Excavation, AH, FME, Class B9
MDOT pay item · 203-EX020

Borrow Excavation, AH, FME, Class B9: Mississippi winning bid prices

The low bidder priced borrow excavation, ah, fme, class b9 at a median $24.75 per cubic yard over the last 12 months (5 contracts), up 8% from the year before and up 64% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$24.75
5 contracts
Median, prior 12 months
$23.00
5 contracts
Median, 2020
$15.12
7 contracts
Winner vs. field
12% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$20$40$60$802020202120222023202420252026*$24.75
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60$80$1001001.0K10K100K1.0M
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$33.50≤1.9K$20.501.9K–10K$17.4510K–39K$10.00>39K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren21K CY$24.75$32.113
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee2.9K CY$25.00$30.508
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto10K CY$22.00$25.006
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin6.4K CY$18.00$24.632
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette3.0K CY$25.60$26.505
Sep 23, 2025Bridge Replacement on SR 704 (Bridge No. 162.5)Benton96 CY$100$81.004
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette1.6M CY$13.75$13.753
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln1.2K CY$24.40$31.503
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren12K CY$23.00$24.653
Nov 7, 2024Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington88K CY$21.00$35.254
Oct 22, 2024Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc32K CY$14.00$14.504
Oct 22, 2024Safety Improvements on SR 25 at Longview RoadOktibbeha1.7K CY$46.00$55.502
Oct 22, 2024Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo1.4K CY$40.00–1
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren1.7K CY$52.00$72.752
Oct 22, 2024Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes1.4K CY$35.00$38.604
Sep 4, 2024Construction project, Madison CountyMadison355 CY$40.00$40.003
Aug 27, 2024Construction project, Yalobusha CountyYalobusha62K CY$20.81$29.662
Jul 30, 2024Bridge Replacement on SRSunflower13K CY$30.00$29.004
Jun 4, 2024Bridge Replacements on USHolmes183K CY$8.50$12.677
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah41K CY$18.00$21.752

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access