Delineators, Post Mounted, Double Yellow: Mississippi winning bid prices

The low bidder priced delineators, post mounted, double yellow at a median $111 per each over the last 12 months (7 contracts), up 52% from the year before and up 93% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$111
7 contracts
Median, prior 12 months
$73.00
9 contracts
Median, 2020
$57.50
4 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$25$50$75$100$125$1502020202120222023202420252026*$121
Price vs. quantityEvery winning price since 2020 (log scale)
$25$50$75$100$125$150$175110100
Does quantity matter?Median winning price by quantity band
$0$20$40$60$80$100$80.50≤12$60.0012–26$68.0026–52$66.00>52

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery26 EA$60.00–1
Oct 27, 2026Construction project, Madison CountyMadison54 EA$131$1313
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin18 EA$141$1406
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison1 EA$111$98.333
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison30 EA$148$1492
Apr 28, 2026OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin45 EA$83.95$83.953
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe13 EA$48.00$48.004
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette8 EA$145$1453
Aug 26, 2025Mill & Overlay approximately 4.3 miles of I-55 Carroll Co from the Montgomery County Line Carroll, Montgomery2 EA$65.00–1
Jul 31, 2025Mill & Overlay approximately 14 miles of I-22 in Union County from the junction at SR 30 tUnion, Pontotoc74 EA$50.00$50.002
May 28, 2025Remove & Replace OGFC Lift on approximately 2 miles of I-220 from the Hinds County Line toMadison, Hinds100 EA$130$1302
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton26 EA$56.93–1
Feb 25, 2025Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott CouRankin9 EA$95.00$95.003
Jan 28, 2025Wayne Installation of Ramp Gates on I-59 from the Louisiana State Line to north of US 84 &Lincoln, Pike, Forrest, Jones, Lamar, Pearl River, Adams6 EA$75.00$75.003
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren2 EA$73.00$73.003
Nov 26, 2024Mill & Overlay approximately 5 miles of I-22 from the Union County Line to the Belden ExitLee, Pontotoc58 EA$45.00$45.003
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah12 EA$86.00$88.002
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike51 EA$104$99.252
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison96 EA$120–1
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison34 EA$163$1562

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.