BidCrew Data
BidCrew Data / Mississippi / Prices / Delineators, Guard Rail, White
MDOT pay item · 630-F006

Delineators, Guard Rail, White: Mississippi winning bid prices

The low bidder priced delineators, guard rail, white at a median $30.00 per each over the last 12 months (66 contracts), up 9% from the year before and up 58% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$30.00
66 contracts
Median, prior 12 months
$27.50
49 contracts
Median, 2020
$19.00
30 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$15$20$25$30$352020202120222023202420252026*$30.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60$80110100
Does quantity matter?Median winning price by quantity band
$0$10$20$30$26.00≤22$26.0022–42$26.0042–85$25.00>85

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike42 EA$47.05$47.003
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest14 EA$50.00–1
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River246 EA$50.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery328 EA$46.25–1
Oct 27, 2026Construction project, Madison CountyMadison28 EA$37.85$37.853
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren443 EA$55.00$55.003
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson54 EA$35.40–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin24 EA$34.00$33.176
Sep 22, 2026Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union1 EA$59.00$60.006
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington16 EA$38.56$39.286
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate231 EA$31.50$32.253
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike48 EA$32.90$35.003
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie66 EA$36.65$37.386
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington11 EA$31.10–1
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba16 EA$35.00$34.654
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey44 EA$33.00$33.003
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee16 EA$32.00$33.508
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren108 EA$31.09$31.093
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds92 EA$27.17$27.173
Jul 28, 2026Micro-Surface approximately 14 miles of SR 512 & SR 513Clarke165 EA$29.25$32.162

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access