BidCrew Data
BidCrew Data / Mississippi / Prices / Cap Cleaning
MDOT pay item · 907-824-C001

Cap Cleaning: Mississippi winning bid prices

The low bidder priced cap cleaning at a median $1,785 per each over the last 12 months (21 contracts), down 11% from the year before and up 49% since 2022.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1,785
21 contracts
Median, prior 12 months
$2,000
24 contracts
Median, 2022
$1,200
1 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1,000$1,500$2,000$2,5002020202120222023202420252026*$1,785
Price vs. quantityEvery winning price since 2020 (log scale)
$0$2,000$4,000$6,000$8,00010100
Does quantity matter?Median winning price by quantity band
$0$500$1,000$1,500$2,000$2,000≤5$1,5855–9$1,5509–18$1,500>18

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala4 EA$2,000$1,8004
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren11 EA$1,785$1,7853
Sep 22, 2026Bridge Repair on SR 433 over Mound Creek (Bridge No. 11.6)Yazoo4 EA$1,250$1,2384
Sep 22, 2026Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington9 EA$1,250$1,9064
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn6 EA$1,500$2,5007
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey11 EA$2,100$2,1003
Aug 25, 2026US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma4 EA$3,500$1,9006
Jul 28, 2026Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar5 EA$7,800$3,9254
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo13 EA$1,400$2,2508
Jun 5, 2026Bridge Repair on MS 311 over Little Coldwater River (Bridge No. 11.8)Marshall4 EA$2,000$2,6009
May 27, 2026Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola8 EA$1,500$2,0005
Apr 10, 2026Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo18 EA$2,914$3,0003
Feb 24, 2026Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower19 EA$1,700$2,0007
Nov 25, 2025Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren13 EA$1,150$2,0005
Nov 25, 2025Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette11 EA$1,500$2,5006
Nov 25, 2025Bridge Repair on SR 3 over Short Creek, Bridge No. 32.7Yazoo6 EA$1,500$1,5755
Oct 29, 2025Bridge Repair on I-220 over Lynch Street (Bridge Nos. 0.5A & 0.5B) & on I-55 North to I-22Hinds, Madison8 EA$1,900$1,9003
Oct 28, 2025Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 oDeSoto, Marshall25 EA$2,500$1,6005
Oct 28, 2025Bridge Repair on US 278 over the Buttahatchie River (Bridge No. 21.6Monroe6 EA$4,000$3,1684
Oct 28, 2025Bridge Repair on US 98 Magees Creek and Relief Bridges Nos. 99.0, 99.0B, 99.1 & 99.1BWalthall22 EA$2,500$1,8492

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access